Free tools · Reorder point calculator
Free calculator

Inventory reorder point calculator

The reorder point is the stock level at which you should order again. It is average daily use × lead time in days, plus safety stock.

Your numbers

The boxes start with an example. Replace it with your own numbers.

In the unit you count in: kg, litres, packs.

Days from placing the order to receiving it.

Extra you keep for a busy day or a late delivery.

The sum runs in your browser and the numbers you type are not sent to us. If you agreed to measurement, we count only that a calculator was used, never what you typed. A copied link holds only the numbers in the boxes.

Your result

Result
Press "Work it out" to see it here.

These are your own figures. We show no market averages.

The problem this solves

Order too late and you run out on a busy night.

Order too early and money sits on the shelf, and food goes bad.

A reorder point tells you when to order.

How to use it

  1. Type your average daily use of the item.
  2. Type the lead time, which is how long the supplier takes to deliver.
  3. Type the safety stock you keep, and the stock you have now.
  4. Press "Work it out" to see your reorder point.

Embed this calculator

Show this calculator on your own website. Paste this code into your page. It shows the same boxes and the same sum, with a small link back to Zentaro Serve. It needs no sign-up.

Preview the embed

The formula

Reorder point = average daily use × lead time (days) + safety stock.

A worked example (made-up numbers)

  1. You use 12 kg of rice a day. The supplier takes 3 days. You keep 10 kg as safety stock.
  2. Reorder point = 12 × 3 + 10 = 46 kg.
  3. You have 40 kg now. That is below 46 kg, so it is time to order. It will last about 3.3 days.

What this does not cover

  • This is a guide figure, not an order.
  • Daily use changes with the season, the weekend and festivals. Use a recent average.
  • It ignores stock already on order and how reliable the supplier is.
  • It does not say how much to order, only when.

Formula version 1.2. Last reviewed 16 November 2026. This is a guide, not financial or tax advice.

Questions about this calculator

What is safety stock?

It is extra stock you keep in case you sell more than usual or the delivery is late.

What is lead time?

It is the number of days between placing an order and receiving it.

Want these numbers without the typing?

Zentaro Serve launches in 2027. It keeps your sales, stock and recipes in one place. Tell us what you run today and we will get in touch.

Talk to us Join the early access list

Last updated:

Pricing is coming soon

We are keeping pricing simple. We will share it when Zentaro Serve launches in 2027. Join early access and we will tell you first.